Skip to content
Installation

From first metre to first ball

  1. 01

    Survey

    We visit your space and take measurements.

  2. 02

    Design

    We propose the setup for your room.

  3. 03

    Deposit

    You confirm the order with a deposit.

  4. 04

    Preparation

    We prepare the equipment, enclosure and PC.

  5. 05

    Final payment

    You pay the balance before installation.

  6. 06

    Installation and calibration

    We install and calibrate everything at your home.